2019
BAMAG has participated in Cairo Watrex Expo 2019 from 20 – 22 March 2019

Watrex Expo is the 4thInternational Exhibition & Conference for Water&Wastewater Technologies

(more…)


2018
Primary Handing Over El Mahmoudia Project – Beheira Governorate

Egypt’s President – H.E. Abdel Fattah El Sisi – inaugurates  Mahmoudiya WTP (86.000 m3/day) via video-conference.


Primary Handing Over El Mahmoudia Project – Beheira Governorate

Potable Water Treatment Plant (86.000 m3/day) Primary Handing Over on 14th of March 2018

 


Abuqir Fertilizer Industrial WWTP

Start-up of BAMAG’s Abuqir IWWTP (ZLD) during the visit of the Egyptian Minister of Petroleum and Mineral Resources – Eng. Tarek El Molla – to Abo Qir Fertilizer Co.


Abuqir Fertilizer Industrial WWTP

Pumping Treated Water in AFC Cooling Tower

Operation of Ultrafiltration / Reverse Osmosis System (UF/RO)

Operation of Dynasand Filter

Installation of Instrumentation Devices (Wika) is ongoing in the NH3 Removal Area


Bamag has received the Letter of Award 3rd Stage for Amirya Wastewater Treatment Plant

Wastewater Treatment Plant (100.000 m3/day)


Final Handing Over Sheikh Zayed Extension Project – Giza Governorate

Potable Water Treatment Plant (125.000 m3/day)


Final Handing Over El Shohadah Project – Menoufia Governorate

Potable Water Treatment Plant (86.000 m3/day)


2017
Final Handing Over Amriya Project – Alexandria Governorate

Domestic Wastewater Treatment Plant (100.000 m3/day)


Activate Bamag`s website